Inspections & Standards
The quality layer over turnovers: scored runs against the checklist library, with failures that become work orders.
Runs / 30d
22
Average score
92/100
Failed items
8
Follow-up work orders
14
Quality by dock
Dock A95/100 · 6 runs
Dock B88/100 · 6 runs
Dock C94/100 · 6 runs
Mooring Field100/100 · 2 runs
Dry Stack88/100 · 2 runs
Inspector performance
- 96% passRae IbarraDockmaster
- 91% passMarcus VossDockhand
- 88% passNina FreyDetailer
- 94% passOwen BellService Tech
- 98% passPriya NakamuraInspector
- 85% passCole WardDockhand
Checklist library
5 templatesSlip turnover
6 items- Lines coiled and cleats clear
- Pedestal off, breaker reset
- Finger pier washed down
- Fenders and bumpers checked
- Trash and recycling pulled
- Slip number placard legible
Pumpout
4 items- Hose seated, no spill
- Gallons logged
- Deck rinsed
- Disposal manifest signed
Dockside prep
4 items- Power cord staged at pedestal
- Water hose staged
- Welcome packet on cleat
- Fit check vs LOA / beam
Storm prep
5 items- Doubled spring lines
- Canvas struck and stowed
- Shore power disconnected
- Dinghy secured or hauled
- Owner notified
Detailing
4 items- Hull wash and rinse
- Stainless polished
- Non-skid scrubbed
- Interior vacuum
Recent runs
| Berth | Checklist | Inspector | Date | Score | Failures |
|---|---|---|---|---|---|
| A-01 | Slip turnover | Priya Nakamura | Aug 8 | 67 | 2 items |
| A-12 | Pumpout | Priya Nakamura | Aug 6 | 100 | clean |
| A-23 | Dockside prep | Priya Nakamura | Aug 7 | 100 | clean |
| B-04 | Storm prep | Priya Nakamura | Aug 2 | 100 | clean |
| B-15 | Detailing | Priya Nakamura | Jul 31 | 50 | 2 items |
| B-26 | Slip turnover | Priya Nakamura | Aug 2 | 100 | clean |
| C-03 | Pumpout | Priya Nakamura | Aug 13 | 100 | clean |
| C-14 | Dockside prep | Priya Nakamura | Aug 8 | 100 | clean |
| C-25 | Storm prep | Priya Nakamura | Aug 12 | 80 | 1 item |
| M-08 | Detailing | Priya Nakamura | Aug 17 | 100 | clean |
| M-19 | Slip turnover | Priya Nakamura | Aug 8 | 100 | clean |
| R-04 | Pumpout | Priya Nakamura | Aug 14 | 100 | clean |
| R-15 | Dockside prep | Priya Nakamura | Aug 6 | 75 | 1 item |
| A-02 | Storm prep | Priya Nakamura | Aug 5 | 100 | clean |
| A-13 | Detailing | Priya Nakamura | Aug 6 | 100 | clean |
| A-24 | Slip turnover | Priya Nakamura | Aug 5 | 100 | clean |
| B-05 | Pumpout | Priya Nakamura | Aug 13 | 75 | 1 item |
| B-16 | Dockside prep | Priya Nakamura | Aug 1 | 100 | clean |
| B-27 | Storm prep | Priya Nakamura | Aug 15 | 100 | clean |
| C-04 | Detailing | Priya Nakamura | Aug 1 | 100 | clean |
| C-15 | Slip turnover | Priya Nakamura | Aug 14 | 83 | 1 item |
| C-26 | Pumpout | Priya Nakamura | Aug 2 | 100 | clean |